| Vývojář: | Baltoro Minis (56) | ||
| Cena: | * $2.49 | ||
| Hodnocení: | 0 | ||
| Recenze: | 0 Napsat recenzi | ||
| Seznamy: | 0 + 0 | ||
| Body: | 0 + 0 ¡ | ||
| Nintendo Store | |||
Popis
WHAT IS FLOW LINES VS. ?
If you like classic puzzle video games for 1 or 2 players... we have a lot of stuff for you! Inspired by the very best in the genre, Flowlines Vs. aims at becoming one of the greatest party games out there. We want players to solve puzzles, to compete with others at it, and to play - everywhere and with everyone.
Pair up all the matching sockets on the board by drawing continuous lines, without crossing over other lines or branching off. Cover the entire board while connecting all sockets!
Watch out for time-limited stages, or for the limit on moves you can make per stage!
IN FLOWLINES VS. YOU WILL FIND:
• Over 400 levels you can play in, in single player mode or versus multiplayer mode!
• Atmospheric soundtrack emphasizing on the atmosphere of the game!
• 50+ amazing graphical themes!
• Awesome party atmosphere!
• Easy to play and hard to master.
• Both adults and children can pick up the game quickly, thanks to the Intuitive tutorial!
• Play any way you like - Joy-Con™, Pro Controller, using the touch screen or in handheld mode.
• Get your hands on special rewards available through our Achievement System.
• 8 supported languages... English, French, Spanish, Italian, German, Portuguese, Brazilian, Turkish... and even more coming soon.
Go ahead, try it out!
Snímky obrazovky






Novinky
- Verze: Switch
- Aktualizováno:
Cena
-
* Nákupy v aplikaci - Dnes: $2.49
- Minimální: $0.04
- Maximální: $4.99
Sledovat ceny
Vývojář
- Baltoro Minis
- Platformy: Nintendo Hry (56)
- Seznamy: 0 + 0
- Body: 2 + 0 ¡
- Hodnocení: 0
- Recenze: 0
- Slevy: 24
- Videa: 0
- RSS: Odebírat
Body
0 ☹️
Hodnocení
0 ☹️
Seznamy
0 ☹️
Recenze
Buďte první, kdo bude hodnotit 🌟
Další informace
- Verze: Switch
- Kategorie:
Nintendo Hry›Puzzle a minihry - OS:
Switch - Podporovaný jazyk:
American English,Brazilian Portuguese,British English,Canadian French,French,German,Italian,Japanese,Korean,Latin American Spanish,Portuguese,Spanish,Traditional Chinese - Hodnocení obsahu:
Everyone - Nintendo Store Hodnocení:
0 - Aktualizováno:
- Datum vydání:
- 🌟 Sdílet
- Nintendo Store
Mohlo by se Vám také líbit
-
- Party Bundle: Ludomania & Flowlines VS & 2048 Battles
- Nintendo Hry: Simulátory Podle: Baltoro Games
- * $1.99
- Seznamy: 0 + 0 Hodnocení: 0 Recenze: 0
- Body: 0 + 0 Verze: Switch Spark up your party with these three cooperative logic games: - Ludomania: a one-of-a-kind app with which you can play the most popular variations of the medieval Indian board game: ... ⥯
-
- 15 in 1 Family Games Mega Collection
- Nintendo Hry: Akční a adventury Podle: Baltoro Minis
- * $49.99
- Seznamy: 0 + 0 Hodnocení: 0 Recenze: 0
- Body: 0 + 0 Verze: Switch The 15 in 1 Family Games Mega Collection brings you a huge variety of fun-packed games from fast-paced racing and exciting action challenges to strategic puzzles and classic games. ... ⥯